Journal
Start with Bankers Hill and Golden Hill. These neighborhood stories look at the ground, street patterns and buildings around Broderick and ALÜM, projects connected to this journal’s team. Browse the rest of the journal below.

Bankers Hill: streets, slopes and Balboa Park
Bankers Hill, San Diego: street grid, canyons and Balboa Park connections, with disclosed Broderick context at 301 Spruce Street.

Golden Hill: terraces, streets and architecture
Explore Golden Hill, San Diego, through terraces, canyons and varied architecture, with disclosed ALÜM context at 25th and C.

Spruce Street's footbridge and the route to the trolley
The history of Bankers Hill's Spruce Street footbridge explains a practical connection across a canyon, with disclosed Broderick neighborhood context.

Golden Hill’s 25th Street, from the sidewalk up
How Golden Hill’s 2016 plan frames 25th Street, and what to look for at the sidewalk when considering ALÜM’s stated mixed-use design.

The Botanical Building: a garden held in redwood
Redwood lath, restored arcades and a living collection give Balboa Park’s Botanical Building a story that reaches beyond its familiar outline.

The discipline of the Salk Institute
Louis Kahn’s Salk Institute joins an exacting courtyard composition to adaptable laboratories. Its materials and maintenance deserve the same attention as the view.

Santa Fe Depot: San Diego prepares for arrival
Built for exposition crowds, Santa Fe Depot tells a civic history through tiled towers, redwood beams in the waiting room and a forecourt that kept changing.

Leave room for the piazza in Little Italy
A table, a patch of shade, a place to play: Piazza della Famiglia and Amici Park put Little Italy’s street life on a different footing from a dining guide.

How Geisel Library found its shape
William Pereira’s concrete structure and Gunnar Birkerts’ underground addition approach the same problem differently: making space for a working library.

Making room for the coast at Sunset Cliffs
At the western edge of Point Loma, trails, habitat and erosion give Sunset Cliffs a design story that asks for restraint as much as access.
Development profiles
East Village Green
The plan for East Village Green makes room for the everyday life of a neighborhood: a place to play outside, meet indoors or spend time together. The City describes a park built in phases, with a broader concept extending beyond the initial construction area.
Park construction in phases; opening still unverified
Seaport Village Redevelopment
1HWY1's Seaport San Diego proposal would recast this stretch of waterfront as a mixed-use district. For now, that ambition belongs to a proposal: the Port places it in environmental review, short of a construction-ready approval or a completed redevelopment.
Waterfront proposal in environmental review; further approvals required
Manchester Pacific Gateway
One Broadway Hotel & Plaza is the hotel proposal still promoted under the Manchester Pacific Gateway name. The larger redevelopment has already split into distinct pieces: a 2020 announcement records the completed Navy building and IQHQ's acquisition of much of the site, now associated with RaDD.
Hotel proposed; Navy building complete; RaDD delivered separately
Navy Broadway Complex / RaDD District
IQHQ's Research and Development District is the lab, office and retail side of the former Navy Broadway redevelopment, and its owner lists it as delivered. The Navy's replacement headquarters is a separate component with its own completion history, rather than another part of RaDD's commercial inventory.
Owner lists RaDD as delivered; Navy headquarters complete; neighboring hotel still proposed
East Village High-Rise Pipeline
East Village's housing pipeline is a collection of separate developments, each with its own timetable and backers. The original overview brings market-rate and affordable homes into the same account, but a permit, construction start or completion has to be followed building by building.
Separate projects at different stages, without one neighborhood finish date
Horton Plaza Repositioning
Horton Plaza's reinvention as an office-and-commercial campus reached a change of ownership before it reached a full reopening: the lender took over through foreclosure in August 2025. By July 2026, reporting described specific work on the park, theater access and permits, though not a reopened campus as a whole.
Redevelopment in lender ownership, with reported permit work and public-access obligations
Convention Center Expansion
The funded work at the Convention Center is repair work. A February 2026 City resolution puts $21,402,788 toward the existing building's infrastructure; it does not authorize building a larger convention center. Physical expansion is a separate undertaking.
FY2026 repair funding approved; physical expansion unresolved in the reviewed record
Mission Valley Riverwalk
Riverwalk is Hines and the Levi-Cushman family's phased plan for homes, shops and workplaces beside river open space, with a future trolley station. Financing and the market-rate construction restart came in October 2025, rather than 2026; the team's April 2026 update describes work continuing.
Construction reported in phases; completion and leasing dates are still forecasts
Midway Rising
Midway Rising would replace the Sports Arena site with a new arena, homes, shops, dining and public space. State legislation moved the proposal's approval pathway forward in September 2026, but the first-party material reviewed does not establish final City approval or a construction start.
Redevelopment proposed; legislation advanced it, but final approvals remain unverified