Convention Center Expansion
San Diego Convention Center, downtown bayfront
A funded repair program and a potential physical expansion are separate undertakings. A February 2026 City resolution allocates $21,402,788 for existing-building infrastructure; it does not authorize construction of a larger convention center.[19]
- Documented status
- FY2026 repairs funded; physical expansion remains unresolved in reviewed evidence
- Evidence basis
- Mixed evidence; see distinctions below
- Originating coverage
- AMSI ·
- Sources checked / profile published
01
Approved maintenance investment
The Council adopted Resolution R-316636 on February 23, 2026, with final passage February 26. It assigns Measure C hotel-tax funds to roof, power, electrical and central-plant work at the existing facility.[19]
Measure C was approved by voters in March 2020. Following litigation-related delay, the City began collecting the additional hotel tax on May 1, 2025; the resolution assigns 59% of that additional tax to the Convention Center Revenue Account.[19]
- FY2026 allocation
$21,402,788 — the precise approved amount behind AMSI's 'over $21 million'
Confirmed in cited source · Source ↗
- West roof
$7,500,000 for engineering, design and construction
Confirmed in cited source · Source ↗
- Central plant
$9,503,888 for overhaul design and subsequent replacement work, plus $600,000 for quality assurance and quality control
Confirmed in cited source · Source ↗
- Power and electrical systems
$1,275,000 for west generator and underground storage tank work; $1,423,900 for transformers; $1,100,000 for switchgear and panels
Confirmed in cited source · Source ↗
02
Maintenance needs are not an expansion budget
The Union-Tribune's February 24, 2026 report describes nearly $120 million of urgent repairs over five years and, more precisely, more than $118 million in that period. Those are descriptions of the same near-term program, not two amounts to add together.[11]
The report cites a 2022 facility assessment identifying nearly $244 million of repairs and capital improvements over 25 years, or more than $452 million with inflation. This corrects the source article's ambiguous 'up to $244 million+' formulation: the time horizon and inflation basis matter.[11][20]
The reported problems include boilers and chillers, electrical infrastructure, plumbing and roof leaks in a 2.6-million-square-foot building. These works support continued event operation; they do not by themselves increase exhibit space.[11]
- Facility size
2.6 million square feet, as reported in connection with the 2022 condition assessment
Reported by cited source · Source ↗
- Five-year repair estimate
More than $118 million, described in the same February 2026 report as nearly $120 million; not a separate expansion appropriation
Reported by cited source · Source ↗
- 25-year needs
Nearly $244 million from the reported 2022 assessment; more than $452 million after inflation, according to City staff quoted in February 2026
Reported by cited source · Source ↗
03
Expansion and waterfront land
Measure C's convention-center objective included enlargement, but February 2026 reporting describes higher construction costs and unresolved control of the adjoining Fifth Avenue Landing leasehold. The reported lease expiry is mid-2027, not an expansion completion date.[11]
The same report says a 2018 settlement remained in place and constrained public discussion or planning steps until the following year. Neither that report nor the repair resolution establishes a new expansion groundbreaking date. Tourism, convention capacity and larger-event opportunities remain the policy context rather than a promised outcome.[11][19]
- Expansion constraints
Rising costs and control of the Fifth Avenue Landing waterfront parcel, as reported February 24, 2026
Reported by cited source · Source ↗
- Lease chronology
Fifth Avenue Landing lease reported to expire in mid-2027; no implication that expansion opens in 2027
Reported by cited source · Source ↗
Sources & further reading
AMSI is the originating coverage. The linked records and reporting provide the verification, historical context and corrections above. Reference numbers are local to this profile.
Related profiles
Horton Plaza Repositioning
The former shopping mall's office-and-commercial conversion passed to its lender through foreclosure in August 2025. July 2026 reporting identifies concrete park, theater-access and permitting work, but does not establish that the whole campus has reopened.
Lender-owned redevelopment; permitting and public-access obligations reported
East Village High-Rise Pipeline
A neighborhood-wide collection of residential developments, not one tower or a single developer's master plan. The original article describes market-rate and affordable housing at different stages; individual permits, construction starts and completions must be checked separately.
Multiple projects at different stages; no single pipeline completion date