Development / 02
Seaport Village Redevelopment
Central Embarcadero, beside downtown’s Marina District and Columbia waterfront
1HWY1's Seaport San Diego proposal would recast this stretch of waterfront as a mixed-use district. For now, that ambition belongs to a proposal: the Port places it in environmental review, short of a construction-ready approval or a completed redevelopment.[15]
- Documented status
- Waterfront proposal in environmental review; further approvals required
- Evidence basis
- Mixed evidence; see distinctions below
- Originating coverage
- AMSI ·
- Sources checked / profile published
01
Where the proposal begins and ends
The boundary takes in much more than Seaport Village. The Port includes Tuna Harbor, Embarcadero Marina Park North and Ruocco Park, but leaves The Headquarters and Fish Market Restaurant outside the project area. Those edges matter when judging how much of the waterfront would change.[15]
There is no single set of figures that can safely stand in for an approved design. The AMSI account provides the quantities that follow, while the developer's live vision describes more than 16 acres of recreational open space. They should be read as different descriptions of the proposal.[6][14]
- The selected team
The Port selected 1HWY1 in 2016. That decision chose a team; it did not give final approval to build.
Confirmed in cited source · Source ↗
- Who's behind it
AMSI describes Jacobs-family backing, and a 2023 news report carried on the developer's site identifies Jeff Jacobs as a 1HWY1 principal.
Historical record · Source ↗
- AMSI's cost and footprint
AMSI gives $1.6 billion and 70 acres. Those figures are not used here as the current estimate or project boundary.
Reported by cited source · Source ↗
- The Port's study boundary
Approximately 102 acres, made up of 39 acres of land and 63 acres of water. The water area grew from the initial proposal.
Proposed / planned · Source ↗
- The estimate in the Port FAQ
The Port FAQ carries 1HWY1's $3.8 billion estimate. Because the FAQ is undated, it does not establish a fresh 2026 budget.
Proposed / planned · Source ↗
- What environmental review covers
The September 2023 notice sets out about 2.7 million sq ft of land-based mixed uses, plus 561,400 sq ft of floating docks and piers.
Proposed / planned · Source ↗
- The timetable in AMSI's account
AMSI gives early 2024 for groundbreaking and late 2027–2028 for completion, dates at odds with primary-source accounts of continuing review. They are not reliable dates for planning a trip or an investment.
Reported by cited source · Source ↗
02
The visitor district in AMSI's account
Hotels and commercial uses occupy a large part of AMSI's version. The developer's live vision still includes hotels, dining, shops, events and research, but it does not validate each of the older quantities. The figures below describe a reported program, not built floor space or firm commitments.[6][14]
- Hotel program
AMSI's version calls for six hotels containing 1,933 rooms.
Reported by cited source · Source ↗
- Retail and dining
The account allocates 276,000 sq ft to retail and dining: a food-and-beer hall, permanent shops and restaurants, and temporary pop-ups.
Reported by cited source · Source ↗
- Gatherings and film
AMSI includes a 20,000 sq ft event facility alongside a cinema with seating for 120 people.
Reported by cited source · Source ↗
- Offices
AMSI's reported program includes 150,000 sq ft of office space.
Reported by cited source · Source ↗
- Parking provision
The AMSI version includes 2,200 parking spaces.
Reported by cited source · Source ↗
03
Public space and the water's edge
Access to the bay deserves as much attention as the proposed attractions. The developer describes an observation tower and aquarium, an urban beach, expanded water access and an educational partnership with UC San Diego's Scripps Institution of Oceanography. AMSI's earlier account is more specific about names and dimensions; those details remain attributed to that account rather than confirmed by the live vision.[6][14]
- Observation tower
AMSI reports a proposed observation tower of 480 feet.
Reported by cited source · Source ↗
- Aquarium concept
AMSI describes an OdySea-branded aquarium of 178,490 sq ft.
Reported by cited source · Source ↗
- Open space and rooftops
AMSI lists 28 acres of public open space and 10 acres of rooftop decks. These are different measures from the developer's live description of more than 16 acres for recreation.
Reported by cited source · Source ↗
- Changes at Ruocco Park
AMSI's account includes redesigning Ruocco Park.
Reported by cited source · Source ↗
- Getting onto the water
The reported recreation program includes kayak rental, paddleboarding and a floating pool of Olympic dimensions.
Reported by cited source · Source ↗
- Docks and Tuna Harbor
The account calls for 14,000 linear feet of docks, upgrades at Tuna Harbor and access to dining by boat.
Reported by cited source · Source ↗
- Beach and pedestrian link
AMSI describes a new beach and a pedestrian bridge to Embarcadero Marina Park South. That proposed South connection is separate from the Port's redevelopment footprint, which includes Marina Park North.
Reported by cited source · Source ↗
- Marine-focused school
AMSI's reported program includes a 65,150 sq ft charter high school with a marine-biology emphasis.
Reported by cited source · Source ↗
Sources & further reading
AMSI supplied the starting list. These records and articles fill in the history and explain where later information changes the picture. The reference numbers belong to this profile.
- [15] Port of San Diego — Central Embarcadero
- [2] CEQAnet — September 14, 2023 Notice of Preparation
- [6] Seaport San Diego — project vision
- [8] Seaport San Diego — December 17, 2025 project update
- [16] Developer-hosted Union-Tribune report (September 14, 2023)
- [14] AMSI — development roundup (March 18, 2026)
Related profiles
Manchester Pacific Gateway
One Broadway Hotel & Plaza is the hotel proposal still promoted under the Manchester Pacific Gateway name. The larger redevelopment has already split into distinct pieces: a 2020 announcement records the completed Navy building and IQHQ's acquisition of much of the site, now associated with RaDD.
Hotel proposed; Navy building complete; RaDD delivered separately
Navy Broadway Complex / RaDD District
IQHQ's Research and Development District is the lab, office and retail side of the former Navy Broadway redevelopment, and its owner lists it as delivered. The Navy's replacement headquarters is a separate component with its own completion history, rather than another part of RaDD's commercial inventory.
Owner lists RaDD as delivered; Navy headquarters complete; neighboring hotel still proposed