East Village Green
East Village, downtown San Diego; F and G streets between 13th and 15th streets
A phased public park adds recreation rooms, outdoor play areas and gathering space to East Village. City pages describe both a broader park concept and a smaller initial construction area.[1][9]
- Documented status
- Phased construction; opening not verified
- Evidence basis
- Mixed evidence; see distinctions below
- Originating coverage
- AMSI ·
- Sources checked / profile published
01
Park scope and public use
The City identifies Civic San Diego and its Parks & Recreation Department as the project team. The program combines daily recreation with space for neighborhood gatherings and events.[1][9]
- Published park size
3.6 acres on the City parks overview; City Planning separately describes a 4.1-acre overall concept and an approximately two-acre project area.
Confirmed in cited source · Source ↗
- Project team
Civic San Diego with the City of San Diego Parks & Recreation Department.
Confirmed in cited source · Source ↗
- Indoor community space
Planned two-floor community center totaling 14,200 sq ft for meetings and community activities.
Proposed / planned · Source ↗
- Outdoor recreation
A central lawn, play equipment with an interactive water feature, and separate off-leash areas for small and large dogs.
Proposed / planned · Source ↗
- Quiet activities and services
Game and reading space, plus public toilets with an attendant booth.
Proposed / planned · Source ↗
- Art and performance
An art element and performance pavilion are included in the City plan.
Proposed / planned · Source ↗
02
Access, streets and preservation
The park program also changes the surrounding streets and accommodates historic buildings. The City’s sustainability description is qualitative; it does not give measured energy or water savings.[1][9]
- Street design
Reconstruction of 14th Street within the park and changes that allow community events; AMSI also describes accessibility and walkability improvements to the streetscape.
Reported by cited source · Source ↗
- Parking
A two-level public garage with 185 underground spaces is in the published plan.
Proposed / planned · Source ↗
- Land parcels
The plan covers a 60,000 sq ft block between 13th, F, 14th and G streets, a 20,000 sq ft parcel at 14th and G, and a smaller site south of F Street between 14th and 15th.
Proposed / planned · Source ↗
- Historic buildings
Two designated historic buildings are to be relocated as part of the work.
Proposed / planned · Source ↗
- Environmental approach
City materials state an environmentally conscious design objective without a quantified performance target.
Confirmed in cited source · Source ↗
- Delivery sequence
The City describes Phase 1 construction and continuing staged work, including historic-building relocation.
Confirmed in cited source · Source ↗
Sources & further reading
AMSI is the originating coverage. The linked records and reporting provide the verification, historical context and corrections above. Reference numbers are local to this profile.